MineRP (Mine2-4D)
Principal Consultant (July 2012 - November 2012)
• Carried out the CIM Journal paper, Oil Sands Mining Limit with Lerchs-Grossmann Optimization (submitted in August 2012, under blind peer reviewing)
• Carried out the CIM Journal paper, Inventory Calculation with LG pit Optimization Tool (submitted in November 2012, under blind peer reviewing)
• Successfully developed a computer script for coding/flagging block model with percentage to be used in scheduling
• Directly mentoring 3 mining engineers and served as a resource of mining and geo-modeling
Snowden Group, a Downer EDI group
Senior Consultant, Mining Engineering, Mining Modelling (July 2011 - July)
• Carried out the CIM Journal paper, Equipment Lifespan Optimization in the CIM Journal Vol. 3/4
• Successfully carried out a scoping study for Rutile mineralization in Guadalupito Peru including creating mining block model, mine design, scheduling, equipment selection, cash flow forecast.
• Successfully developed truck-shovel optimization computer program
• Successfully developed a computer program for optimizing truck and shovel selections
• Successfully developed a computer program for Monte Carlo experiments (a class of computational algorithms) for mining project financial model
Shell Canada
Senior Mine Planning Engineer (May 2010 - July)
Middle Range Mine Planning/Scheduling/Design,
Geo Block Modeling, Mine Engineering Modeling, Dyke/Tailing Modeling
Canadian Natural Resources
Mine Planning Specialist (June 2008 - April)
• Was responsible for the development of long-range mine and tailing scheduling through the remainder of the mine life, consistent with production requirements, and product output
• Effectively conducted studies of bitumen-fines co-variogram to be used in Covariance-Krigging interpolation
• Successfully created a sensitivity simulation model. I varied uncertainties by proportional relative elevations of facie groupies and formations
• Successfully converted the geological block model to the variable bench height model (GSM) for mine planning
• Successfully redesigned and modeled a constructible dyke#1 with multiple-material block model to be used in volume calculation with MineSight™
• Successfully created a mathematical model to find the bulk ratio and its sensitivity in beach and MFT according to the production progress and the new regulation requirement
• Successfully created final pits with Lerch-Grossmann optimization under a multiple set of economic parameters, (e.g. TV/BIP=12, oil price and mining cost) and complex slopes constraints with MineSight Economic Planner™
• Successfully developed detailed plans and schedules with Xpac Auto Scheduler™ for ore and overburden mining and disposal for life of mine plans for the Horizon project. The plans include material movement and balance, scheduling of mine advances and all associated activities under the bitumen, fines and D50 grades constraints
• Severed as a resource of geo-statistics, and economics theories
Mintec Inc.
Mining Engineer (May 2007 - May)
• Provided consulting and technical services in mining engineering and geology software for US and Canadian companies including Colorado School of Mine, CNRL, Synenco Energy Inc, Exm Associates, Moose Mountain, Norwest Corporation, Sim Geological Inc, Imperial Metals Corp., Norwest Corp., Quadra Mining, Imperial Metals, Teck Coal (Elk Valley), Grande Cache Coal
• Successfully solved hundreds of issues related to mining applications including 3D-CAD design, geo statistics data analysis, modeling, pit optimization analysis, cut of grade analyst, mine activity planning and long term scheduling optimization
• Specialized in 3D block modeling, GSM modeling, Krigging interpolation and ore control for sedimentary deposit such as industrial clay, coal and oil sands
• Conducted studies in an oil sands project for McMurray formation, including tagging mineable blocks, TV/BIP analysis, geotech/rose diagrams, recovery function
• Conducted studies in optimized complex slopes pit with Lerch-Grossmann method under stripping ratio constrain